Boerne Custom Cabinets logoBoerne Custom CabinetsBoerne, TX
Custom Kitchen Remodels photo

Boerne Custom Cabinets

Custom Kitchen Remodels in Boerne, TX

Custom kitchen remodels: design, demo, cabinetry, and install handled in-house, with free written estimates.

  • 15+ Years local experience
  • 500+ Projects completed
  • Licensed & Insured

Serving Boerne and nearby communities.

A kitchen remodel is more than new cabinet doors. It's a new layout, new storage, usually a different flow through the room.

Boerne Custom Cabinets handles the design and the cabinetry build together. The layout you approve on paper is the layout that actually fits your walls, your appliances, and your budget.

What's included

What's Included with Custom Kitchen Remodels

Typically included: new cabinet boxes, doors, and hardware; layout redesign for improved storage and workflow; coordination for countertop fit against the new cabinetry; removal and disposal of old cabinetry.

Optional: under-cabinet lighting, integrated appliance panels, pantry conversion, island additions.

Customer prep: clear out kitchen contents before demo day, confirm appliance models in advance so cabinet openings are cut correctly.

How it works

How Our Custom Kitchen Remodels Process Works

  1. Initial Design Consultation photo
    Step 1

    Initial Design Consultation

    We review your goals and existing layout to scope the remodel.

  2. Space Planning photo
    Step 2

    Space Planning

    A revised floor plan improves storage and workflow before anything is built.

  3. Demolition And Prep photo
    Step 3

    Demolition And Prep

    Old cabinetry and fixtures come out to clear the space for new work.

  4. Cabinetry Installation photo
    Step 4

    Cabinetry Installation

    New custom cabinets go in following the approved design drawings.

  5. Countertop Integration photo
    Step 5

    Countertop Integration

    Countertops are fitted and aligned against the new cabinet run.

  6. Final Walkthrough photo
    Step 6

    Final Walkthrough

    We walk the finished kitchen with you to confirm every detail.

Materials

Materials and Methods for Custom Kitchen Remodels

  • Engineered Wood Panels photo

    Engineered Wood Panels

    A stable base material for cabinet boxes that resists warping through humidity swings.

  • Custom Cabinet Doors photo

    Custom Cabinet Doors

    Built to the new layout's exact openings instead of adjusted from stock sizing.

  • Integrated Appliance Panels photo

    Integrated Appliance Panels

    Panels that conceal refrigerators and dishwashers so the remodeled kitchen reads as one continuous design.

  • Under-Cabinet Lighting photo

    Under-Cabinet Lighting

    Added beneath upper cabinets to improve counter visibility without extra electrical runs.

  • Hardware Finishes photo

    Hardware Finishes

    Pulls and hinges selected to tie new and existing finishes together across the remodeled space.

  • Sealant Coatings photo

    Sealant Coatings

    Applied to cabinet surfaces to extend finish life through daily kitchen use and Texas heat.

Timeline

How Long Does a Custom Kitchen Remodel Take?

A full remodel runs longer than a straight cabinet swap because the layout itself is changing. Here's how it typically unfolds.

  1. 01

    Consult and measure

    same week

  2. 02

    Design and material selection

    1–2 weeks
  3. 03

    Shop build

    4–7 weeks
  4. 04

    Demo and install

    3–7 days

Need a schedule that fits?

Get a Free Estimate

Before & after

Before and After Custom Kitchen Remodels

  • Custom Kitchen Remodels photo
    Before
  • Custom Kitchen Remodels photo
    After

FAQs

Custom Kitchen Remodels FAQs

How much does a custom kitchen remodel cost?

Most full remodels with custom cabinetry run from the mid five figures up, depending on kitchen size, cabinet grade, and whether the layout changes. We give you a written range after measuring your space.

How long does a kitchen remodel take from start to finish?

Expect several weeks for design and the shop build, then a few days on-site for demo and install. Lead time runs longer than a cabinet-only job because the layout is being redesigned.

Do I need a permit for a kitchen remodel?

It depends on scope. Moving plumbing, electrical, or load-bearing walls usually triggers a permit. A cabinet and layout change that doesn't touch utilities usually doesn't. Check with the city or Kendall County before starting.

Is DIY a realistic option for a full kitchen remodel?

Not for the cabinetry and layout work. Demo, electrical, and plumbing coordination carry real risk if the sequencing is off. A layout change needs accurate measurements that are hard to self-correct mid-project.

What affects the price of a kitchen remodel most?

Cabinet grade, kitchen size, and whether the layout changes drive most of the cost. Appliance relocation and plumbing moves add to the budget.

What should I do to prep before the crew arrives?

Clear out cabinets and countertops, confirm appliance models, and set aside a few weeks without needing full kitchen access.

Next step

Get a Custom Kitchen Remodel Estimate

Call (830) 357-7026 or request a free estimate and we'll come measure your kitchen before giving you a written number.

Ask about Custom Kitchen Remodels

Tell us about the project and how to reach you.

Call (830) 357-7026